• Critical Paths: Designing for Secure Travel (Issues in design)
Critical Paths is about safer design of walkways used by travellers. Atkins sets out the general principles by which the environmental design, operation and management of transport systems can reduce opportunities for crime, showing how to integrate the roles of designer, planner and operator for effective crime control.
Books
ASIN 850722799
Author Stephen T. Atkins
Binding Paperback
Condition Multiple conditions available
Format
Language
Publication Date 32509
Publisher Design Council

Write a review

Note: HTML is not translated!
    Bad           Good
Captcha

Critical Paths: Designing for Secure Travel (Issues in design)

  • Product Code: 0850722799
  • Availability: 11
  • Condition: Multiple conditions available
  • £7.77


Available Options